Chapter 4
The impact of the engineering skills shortage
4.1
In this chapter the committee examines the impact of the engineering skills
shortage on infrastructure delivery, economic development, workplace
productivity, public sector capability and employment.
4.2
As well as the significant economic costs and project delays outlined in
this chapter, diminished engineering capacity can have serious consequences for
public safety.[1]
Reports from the National Engineering Registration board, cited by Australian
National Engineering Taskforce (ANET), indicate that a number of public
disasters—some of which have caused loss of life—were the result of
'engineering issues',[2]
including the Thredbo landslide, Lane Cove Tunnel collapse and Canberra
Hospital implosion. This advice is sobering and is a reminder how important
public sector engineering capability is to our communities.
4.3
It is clear to the committee that the consequences of the skills
shortage are being felt every day by employers, employees, governments and the
community.
Impact on economic development and infrastructure delivery
4.4
Entrenched engineering skills shortages, depending on their severity,
are likely to reduce investment and productivity growth in Australia, and
result in poor quality or delayed construction projects. The resulting economic
effects are felt in sectors as diverse as resources, roads, manufacturing,
construction and the development of infrastructure.[3]
4.5
Engineers Australia listed the general impacts of the engineering skills
shortage as including:
-
Increases in wages of engineers and others with engineering
skills
- Reduced retention rates, as employers with a skills shortage
offer higher and higher wages
-
The introduction of skills that are not 'embedded in the local
culture' or 'within that particular industry'
-
Cost overruns and increases in the cost of labour (up to 20 per
cent of total project cost)
-
Loss of engineering activity to the economy
- The loss of projects to overseas, as costs force cancellations,
and
- Reduction in the quality of project outcomes.[4]
4.6
Representing professional engineering firms, Consult Australia
anticipated that unless skills shortages are addressed, there will be sustained
negative impacts for both the private and public sector. Ms Megan Mott, Chief
Executive Officer, observed that government is negatively impacted not just as
a client, but also as a policy maker:
I say that because a lot of the significant challenges that
governments, not only in Australia but across the world, face in population and
demographic change, poverty, climate change mitigation and adaptation and
stability of political environments will require significant engineering input
into their long-term solutions. If there are not enough engineers in the market
in Australia, particularly in our regional significance but also worldwide,
that will have significant implications for delivery of solutions for those
problems.[5]
4.7
The Business Council of Australia (BCA) released a report into
Australia's capital investment on 7 June 2012.[6]
The report points to the $921 billion pipeline of investment in resources,
energy and economic infrastructure, warning that Australia risks not being able
to efficiently deliver these projects because it is becoming a 'high-cost' and
therefore 'high-risk' place to invest. Further, the BCA reported that
Australia's low labour productivity has reduced its competitiveness, and in
relation to skills shortages, the BCA concludes that Australia must train or
attract 'high quality project planners and managers' in order to 'overcome
major skills shortages'.[7]
4.8
A lack of qualified applicants can mean that engineers without all the
necessary skills for the job are being hired.[8]
This can result in inadequate planning and 'trial and error' problem solving,
which can then lead to mid-project changes which put pressure on timelines and
costs. Alternatively, some projects will not proceed at all if adequate staff
cannot be recruited.[9]
Engineers Australia reported that nearly 30 per cent of respondents to a
2010 survey 'indicated that the skills shortages led to major problems
including project delays and cost increases'.[10]
4.9
The committee received evidence suggesting that a number of
infrastructure projects across Australia experience delays and cost blow outs.
The Senate Foreign Affairs, Defence and Trade Committee recently reported that
'for many years the Australian Defence Organisation's program for procurement
of major capital assets has been dogged by delays and cost overruns'.[11]
Professor Trevelyan explained that, although they are better publicised, it is
not just public sector projects that fall victim:
BHP have a public record of major project failures. They have
the HBI plant in the North-West—$3.6 billion. It was sold for scrap metal.
There is the Ravensthorpe nickel project—$3.3 billion. It was sold to a
Canadian company for around $250 million, I believe. I would have to check
those actual figures. They are on the public record, but there are many, many
other project failures which are occurring every day which are not on the
public record. As I have said in my submission, the Australian Department of
Defence cops a lot of criticism for its failures, which are public, but you
will find just as many if not more failures in the private sector if you open
the lid and look hard enough. The difficulty is that the private sector has an
interest in covering up these failures, time and time again, and that is
reflected in all of the information that has come my way.[12]
Scoping
4.10
Poor scoping at the initial project stages can add to cost blowouts and
delays. For example, in 2011 the Association of Professional Engineers,
Scientists and Managers Australia (APESMA) warned that the repair bills for the
Queensland floods could blowout by up to 20 per cent as a result of poor
scoping, due to a shortage of engineers.[13]
The committee heard that poor scoping can lead to adversarial relationships and
poor project outcomes. This in turn can lead to legal disputes arising from
project failures. For example, Consult Australia advised the committee that $6
billion a year is 'wasted on disputation in projects across Australia'.[14]
The committee notes that much of this expense is borne by taxpayers, as many,
if not all, large projects are commissioned by governments.
4.11
Proper scoping requires specialist engineering expertise, as the task
involves:
-
identification of the fundamental objectives of the project;
- development of the principal’s project requirements to achieve
the fundamental objectives, taking into consideration stakeholder and end user
requirements and risk;
-
deciding upon the most appropriate contractual model and risk
profile to deliver the project; and
- inclusion of those requirements into appropriate contractual
scope documents for the project.[15]
4.12
In a 2008 survey conducted by Blake Dawson, 83 per cent of respondents
reported that skills shortages negatively impacted their ability to develop
scope documents to an adequate standard.[16]
More than half of respondents felt that their project was 'inadequately scoped'
before it went to tender on the market.[17]
Mr Phillip Dingeldei, Chairman, Consulting Surveyors National,
observed that when adequate scoping has not been conducted by government, the
costs to business of responding to a tender are very high.[18]
4.13
The Hickory Group, one of Australia's largest apartment builders with
origins in Melbourne, observed that diminished engineering capacity in
government meant that many government departments were poorly equipped to
participate fully in scoping exercises. This meant that there were more
contractual disputes during the life of the project, and the end product cost
more and was subject to more changes. Hickory suggests that the preferred
approach is for government to be involved in the 'scoping of a project with a
number of selected preferred contractors, an exploration of capabilities, and a
finalising of the scoping of the project during this process', after which a
preferred contractor is identified.[19]
Delay or postponement of projects
4.14
Delay or postponement of infrastructure projects has a huge impact on
the community. Engineers Australia reported that a large number of projects are
delayed because of difficulties recruiting expert skilled engineers.[20]
For example, the Australian Institute of Traffic and Planning Management
advised the committee that the loss of productivity as a result of peak hour congestion
traffic is $1.2 billion a year in Perth alone. This is expected to grow to $2
billion by 2020.[21]
The projected impact of delayed road projects is severe, and this is
illustrated by the table on the following page which sets out the estimated
urban traffic and congestion cost trends for Australian cities.
Average unit costs of congestion
for Australian metropolitan areas – current and projected

Source: Department of Infrastructure and Transport [22]
4.15
The effects of the skills shortage are felt more acutely because of the
'lumpy' workload of a lot of government work, and this can also cause delays.
During the Canberra hearing Ms Donna Findlay from Roads Australia
explained the problem, and called for the states and the commonwealth to work
together:
[We] think the states and the federal government need to come
together and have clear transport plans so that you can see where the
investment lies. The contracts of a lot of big projects are being let at the
same time. We will talk about an A-team of engineers and B-team of engineers.
Your A-team go off and they are all working on this project and then another
big project comes up and the B-team are working on that project. Another
project comes up, so you start to have all these great engineers on one project
but not on the other projects. We would like to see all the states and the
federal government come together and have a clear pipeline of road projects for
the future.[23]
4.16
Roads Australia pointed out that communication between the states is often
inadequate, resulting in major projects being programmed at the same time, so
that companies cannot field their best people, who are otherwise occupied, to
do the job.[24]
To address this problem, Roads Australia has taken a proactive approach,
setting up the Roads Australia Pipeline on its website for government agencies
to input plans for the next 12 to 18 months.[25]
4.17
The national infrastructure pipeline is anticipated to address part of
this concern, as well as the federal government's National Infrastructure
Construction Schedule which commenced in May 2012 and is discussed in Chapter
4.[26]
However it is too early for the committee to assess the effectiveness of this
policy.[27]
Impact on employment
4.18
Skills shortages have an impact on employment in a number of ways. The
most significant impact is on training and workforce development. Companies
have focused on meeting the requirements of the boom. The Australian National
Engineering Taskforce reported that companies have responded to capacity
constraints by increasing reliance on contractors and external consultants
rather than building capacity among the existing workforce.[28]
This affects general workforce training and standards across the engineering
profession.
Retention
4.19
The mining boom in Queensland and Western Australia has driven up demand
for workers with engineering and related skills which, because of the skills
shortage, have been recruited to a significant extent from the manufacturing,
power and traffic sectors. This demand exacerbates skills shortages in other
engineering sectors, and creates frustration when recently trained apprentices
depart for the mines.
4.20
The committee heard that a large number of engineers were migrating from
the eastern states to Queensland and Western Australia. The Chamber of Minerals
and Energy Western Australia observed that 11 per cent of population growth in
Western Australia was from interstate migration, and this 'historically is a
very, very high number'.[29]
4.21
Roads Australia advised the committee that once workers attain a higher
level of certification 'they are off to the mining industry'.[30]
Other submitters reported a similar trend.[31]
The Australian Industry Group observed that the mining boom has created a
situation where the manufacturing sector trains apprentices who, once fully
trained, are subsequently attracted to the resources sector. The impact on the
manufacturing sector is significant, and creates a disincentive to train more
apprentices:
This places enormous strain on the manufacturing sector to
retain a highly skilled workforce at the very time the sector is under considerable
competitive pressure from overseas and is in a period of structural adjustment.
The resultant reluctance by manufacturing enterprises to engage apprentices who
subsequently depart to the resources sector contributes to the existing skills
shortage of engineering trades.[32]
4.22
This observation was echoed by Manufacturing Skills Australia, who reported
that manufacturing workers are 'poached' by the construction sector.[33]
4.23
The impact of the skills shortage is also exacerbated for local
governments which tend to have fewer resources but must compete with the mining
and private civil construction sectors for engineers.[34]
Local governments have a large and diverse set of responsibilities. Local
Government Managers Australia noted that local government engineers 'administer
and supervise the design, construction and maintenance of roads and bridges,
pedestrian and cycle facilities, regional airports, buildings, storm water
drainage, recreational facilities, parks and waste disposal'.[35]
4.24
The Institute of Public Works Engineering Australia (IPWEA) represents
engineers who provide engineering services to local communities through local
governments. During the Canberra hearing the committee asked about the impact
of the skills drain, and the National President, Mr Di Iulio explained that
some local councils had excellent engineering capability but other councils
were struggling:
With the number of highly skilled people now being pulled out
of our industry into the mining industry and so forth, having people who are
qualified and who can actually make those appropriate decisions at the right
time are running a bit thin.[36]
4.25
However, it is worth bearing in mind that even mining companies, those
to whom skilled workers most commonly are attracted, sometimes struggle to keep
staff. The Association of Mining and Exploration Companies (AMEC) reported that
most of their members are small companies who struggle to retain quality staff,
as many move to larger companies once they have developed their skills. Mr
Justin Fromm explained:
[AMEC's] membership is the explorers, the emerging miners,
the smaller end of town: small numbers of staff, engineers are few and far
between. The anecdotal stories that we hear when we talk to our members are
that the bigger companies drag through those engineers. They will stay with the
smaller companies for a little while to get their careers started and then they
will be drawn off to the larger companies. From our point of view, the
difficulty is that the little companies are struggling with their engineering
skills. The big companies can take care of themselves with respect to their
graduate programs—and I do not have a full understanding of those programs—but
our issue is for the little companies trying to access those same engineering
skills for their projects.[37]
4.26
As discussed in Chapter 2, many companies are not interested in recruiting
graduates. JSM Appointments, a recruitment company based in Western Australia,
reported that among those graduates who do secure employment, there is a high
turnover as they seek better opportunities elsewhere in the industry, and
higher level roles being offered by competing firms to lure them into the
company.[38]
4.27
Retention in the context of an aging workforce is discussed in Chapter
5.
Impact on public sector capability
4.28
The move away from in-house engineering in the public sector has had a
noteworthy impact on the quality of engineering-related public sector outcomes.
4.29
Consult Australia expressed strong concerns to the committee about the
decline in public sector engineering capability. While Consult Australia did
not believe that there will be, or should be, a return to large public works
departments in government, it considers that government capability can be
improved because:
There is...a significant lack of skill sets in high-level
procurement—people who are able to develop scopes of work, develop conceptual
arrangements for projects, assess tenders in government and then manage those
tenders and manage those jobs with the appropriate allocation of risk as
opposed to complete risk shifting. There is an innate conservatism because
there is lack of confidence in the skill set to manage and understand risk on
projects.[39]
4.30
The Australian Institute of Traffic and Planning Management reports that
as a result of skills shortages, particularly in Queensland and Western
Australia, organisations are now employing staff with minimal traffic and
transport skills, and a number of experienced staff will shortly retire. At the
same time, demand for traffic and transport infrastructure is increasing.[40]
4.31
Following the reduction of engineering teams in government agencies across
Australia in the 1980s and 1990s, Engineers Australia inquired into the impact
of the loss of engineering expertise in a report released in 2000 titled,
'Government as an informed buyer'.[41]
Engineers Australia warned that as a consequence of the reduction in expertise,
governments may be unable to manage engineering contracts because contracting
staff lacked the necessary technical expertise. Further, contracting staff may
also be unable to adequately assess the engineering competencies of contractors
and subcontractors.[42]
4.32
The Australian National Engineering Taskforce 2010 Survey reported some
concerning trends in public sector engineering capability. Quotes from
anonymous respondents reveal the acute skills shortages in government agencies:
Over the last two years, our Engineering department has
dropped from a peak of over 100 people to just 16. We have barely enough people
to maintain existing product, without considering any new projects.[43]
...
We have insufficient qualified people to make effective judgement
calls regarding the expenditure of public money. We have a large number of
partially qualified people doing the job of senior engineers.[44]
...
There are a number of specialist vacancies that have been
very difficult to fill, despite national and international searches - in some
cases we have compromised by appointing relatively inexperienced engineers,
with a view to an intensive skills development program. In the interim we have
a greater reliance on consultants to fill the gap. Challenge will be to keep
the employees once trained up, particularly given the market environment.[45]
...
As a government department, we moved from having a large
in-house engineering workforce, to outsourcing most functions. We are now
largely an administrative/management agency. However with that outsourcing we
lost a lot of institutional knowledge and capability. We struggle to remain an
informed client and are desperately trying to build technical expertise in key
areas that cannot be met through the private sector. The current situation is
inadequate to meet current demands, let alone provide a sustainable model to
meet future demands. The organisation has not successfully tackled the issue of
attraction and retention of engineers and allied technical personnel.[46]
4.33
In 2003 Engineers Australia released a policy on government purchasing.
In this document Engineers Australia set out recommendations and advice to
government to promote the need for government to properly address technical and
engineering risks when purchasing engineering, information technology and other
technical products.[47]
4.34
Engineers Australia warned the committee that government cannot rely
simply on contract management experience in engineering procurement, arguing
that 'these skills are vital, but are not a substitute for technical
engineering expertise'.[48]
4.35
The Australian National Engineering Taskforce, of which Engineers
Australia is a member, supports these observations, reminding the committee
that the Orgill report into the Building the Education Revolution (BER)
identified only the Queensland Government as an informed purchaser of capital
works projects.[49]
The committee is very familiar with these conclusions, as it also conducted an
inquiry into the BER and was alarmed at the waste of resources through mismanagement,
particularly in New South Wales.[50]
4.36
Finally, the committee notes that filling positions that do still exist
in the public sector is difficult, with recruiters facing the same challenges as
their private sector counterparts. Mr Craig Woolridge, representing the
Australian Institute of Traffic Planning and Management explained to the
committee the difficulty in recruiting quality staff in the public sector:
Within government organisations, whether they be state or
local government ones, we are seeing significant problems in recruiting staff.
In my role at the department of transport I have a 25 per cent vacancy rate.
While we have tried recruiting locally and nationally, that has failed.
Primarily, the people that we after have 10-years-plus experience. Getting
graduates is a bit easier. Obviously, some companies and governments have taken
advantage of the slowdown in other countries through the GFC. We would see that
as a temporary initiative and, obviously, as economies around the world do pick
up those opportunistic pick-ups will not be there in the numbers that they have
been in recent times.[51]
Committee view
4.37
It is clear that public sector capability to act as an informed
purchaser and adequately scope and oversee large infrastructure and construction
projects has been severely eroded over the past decades.
4.38
The committee accepts that the federal government, along with state,
territory and local governments have decided over recent decades to outsource
much of their engineering skills. However, a role that government cannot
outsource is quality decision making, efficient use of taxpayer money and
properly scoped requests for tender. For this reason the committee believes
that governments of all levels should enhance their engineering capacity.
4.39
The committee agrees with a recommendation made by Engineers Australia
that senior technical specialist roles could be created to provide a technical
career pathway (in tandem with traditional managerial/generalist career pathways)
for those seeking to build specialist knowledge while continuing to enjoy
career progression in the public sector. This would reduce the incentive for
experienced engineers to move to the private sector.[52]
4.40
The committee notes the recommendations made by the Australian National
Engineering Taskforce that:
- the Federal Government increase its engineering capacity to
ensure that it is an informed purchaser of engineering infrastructure, in line
with the recommendations of the Building the Education Revolution
Implementation Taskforce, and establish a small Procurement Unit, residing
within the Department of Finance and Deregulation.
-
the Federal Government, through that Procurement Unit conduct an
audit of its procurement capability across all agencies.
-
the Federal Government take to the relevant Standing Council of
COAG a proposal that all States and Territories conduct their own audit, to
ensure that the community is receiving value for-money in infrastructure
delivery; and
- that following this audit, the Federal Government put in place a
series of requirements for baseline engineering competence and capacity in
jurisdictions, including local government, for the management of projects
funded by the Federal Government.[53]
Recommendation 6
4.41
The committee recommends that the government consider creating senior
technical engineering roles in the Australian Public Service. This measure
would ensure that highly qualified technical engineers may continue to build
upon specialist knowledge while enjoying career progression in the public
sector.
Recommendation 7
4.42
The committee recommends that the Department of Finance and Deregulation
reviews the Commonwealth Procurement Guidelines to ensure that the government
is an informed purchaser of engineering infrastructure and that appropriate
advice is provided in relation to procurement decisions that require specialist
technical knowledge.
Conclusion
4.43
The engineering skills shortage has a significant impact on Australia's
economy, workforce, infrastructure and project delivery. The 82 submissions
received by the committee are a testament to how the engineering skills
shortages are impacting a whole range of groups in Australia. The committee
received submissions from industry groups, consulting firms, employer groups,
governments, universities and training providers. In this chapter the committee
has provided a snapshot of the effect that the engineering skills shortages are
having.
4.44
The shortage has resulted in poorly conceived and poorly delivered
projects by both the public and private sectors, culminating in cost blow outs
and delays. In part this is because of a decreased engineering capability in
the public sector – which impacts on the quality of tender selection and indeed
even on the request for tender proposal itself. However, the committee also
heard that poorly delivered projects are also a feature of private enterprise.
4.45
The demand for engineering skills by the mining and resources industries
has impacted on the capacity of other sectors, as engineers migrate to more
lucrative fields. The manufacturing sector and local government sectors are
particularly impacted by this trend.
4.46
The skills shortage has serious flow on effects for the training of
engineers. Many industries feel like they do not have time to train graduates,
particularly as graduates with more than three or four years' experience are
highly employable and likely to move to another job. Training and development
for experienced staff can fall by the wayside amidst high workloads and low
retention rates, further worsening an already deficient situation.
4.47
Having established the depth and breadth of the problem that engineering
skills shortages pose, the committee now turns to consider its specific causes
and what might be done to address them.
Navigation: Previous Page | Contents | Next Page